Engineer Gold Mines Ltd. (TSX-V: EAU | OTC: EGMLF | WKN: A3EEVJ) has announced that crews, supplies, and equipment have arrived on site at its 100% owned Engineer Gold Project, located 30 kilometres southwest of Atlin in northwestern British Columbia. The crews are tasked with re-establishing and rehabilitating the two 20-person camps at the Engineer Mine Project and the TAG Project to expand the company's 2026 exploration programs, as detailed in a July 28, 2026 news release. Both camps are already fully built but have not been used since 2009 (TAG) and 2021 (Engineer).
The immediate rehabilitation of these camps is a strategic advantage, allowing the company to deploy full teams to both sites without the delay and cost of constructing new facilities. This move underscores the company's commitment to advancing its exploration targets efficiently, which is crucial for shareholder value in the junior mining sector.
Spiro Kletas, President and CEO, commented, “We are very excited to re-establish the camps at the Engineer and TAG project sites. The fact that both camps are already in place, built and paid for, is an enormous advantage for Engineer Gold Mines and our shareholders. This will allow the Company to have full teams at both sites very shortly and will enable the Company to expedite our exploration programs.”
The Engineer Gold Project encompasses approximately 18,319 hectares and includes three principal target areas: the historic Engineer Gold Mine, the TAG Property, and the Wann River prospect. The Engineer Gold Mine is a past-producing underground operation with historical production between 1910 and 1952 totaling approximately 14,263 tonnes grading 39.4 g/t gold and 19.5 g/t silver (BC Minfile 104M014). A historical Inferred Mineral Resource, completed in 2011 and amended in 2018, estimated 25,000 ounces of gold at a grade of 19 g/t, based on a 5.0 g/t gold cut-off (O’Brien et al., www.sedarplus.ca).
The TAG Property, located 6 kilometres north of the Engineer Mine, is associated with a 6 km long structurally controlled mineralized system. Historical drilling has returned significant intervals, including hole TAG06-23 which assayed 1.7 g/t Au and 5.1 g/t Ag over 26.7 m, and hole TAG08-59 which assayed 1.5 g/t Au and 8.05 g/t Ag over 42.1 m (Fekete and Simper (2009), Fekete and Skinner (2007); ARIS reports #30931 and #29581). The Wann River prospect, 4 kilometres south of the Engineer Mine, represents an orogenic gold target with a mineralized corridor approximately 800 metres by 180 metres. A quartz grab sample returned 263 g/t gold and 1,350 g/t silver from the Lum showing (Aspinall (2011); ARIS Report #32004).
By rehabilitating the existing camps, Engineer Gold Mines is poised to accelerate its exploration programs, which is essential for delineating resources and advancing the project towards development. This efficient use of existing infrastructure not only reduces costs but also demonstrates the company's operational readiness, a positive signal for investors monitoring the company's progress.


